---
title: "How to build an agent factory around the decisions a person makes"
url: "https://kyberbot.com/blog/building-an-agent-factory-around-decisions"
description: "An agent factory is the old development cycle closed into a loop, with a person at three decision points. Eight stages, what breaks without each, and the order to build."
---

# How to build an agent factory around the decisions a person makes

November 6, 2026·8 min read·Editorial team

A blue rounded assistant device in the middle of a ring of small graphite modules joined by one cable, three of the modules blue with a large push button on top

An agent factory is the old development cycle closed into a loop, and the way to build one well is to start from the three points where a person decides, not from the agent that does the work. The person approves the brief, confirms the verification and agrees to the release. Everything in between is prepared by agents. Move the old process across one to one, with an agent in place of each developer, and you get more output and a longer queue of things waiting for someone’s attention, which is the one resource the factory cannot make more of.

## The old cycle in one paragraph

The classic software development lifecycle (SDLC) is a relay of people. An analyst gathers requirements, an architect designs, a developer writes, a second developer reviews, a tester tests, an operator deploys, someone watches the monitoring. Between each pair there is a handover: a document, a ticket, a conversation in the corridor. Why something was done one way and not another lives mostly in people’s heads. That worked because a developer’s time was the expensive part. In a factory, execution becomes cheap and a person’s attention becomes the expensive part. That turns the logic of the whole cycle around, and it is why KyberBot looks at the factory from the side of the person being asked.

## The loop in eight stages

Above the loop sits a coordinator: an agent that receives a trigger, decides which stage the work is in and starts the right agent with the right model and context. A cheaper model for sorting, a stronger one for briefs, whichever did best in your own tests for review.

Beside the coordinator sits the person’s side of the loop. In our design that is KyberBot. It carries your requests in, carries questions out to you, and holds the policy that says which steps need you at all. The coordinator runs the factory. KyberBot makes sure the factory answers to you.

### 1\. Intake: work arrives through one door

**What happens.** An idea, a bug report, an alert or a request said out loud to your assistant lands in one queue.

**Why it matters.** A factory with six front doors does not know what is on its table, so it cannot measure throughput or cost.

**What breaks without it.** Half the agent work happens off the loop, on laptops, with no record and no numbers.

### 2\. Triage: the cheapest saving in the loop

**What happens.** An agent reads the request, tries to reproduce the problem and puts it in one of three bins: _ready_ (small and clear), _unclear, needs a brief_, or _parked, needs a person_.

**Why it matters.** Sorting and first diagnosis eat hours of the most experienced people. An assistant that knows your context can also clear some “unclear” items with one question to you instead of a guess by an agent.

**What breaks without it.** The execution agent gets a vague task and produces a lot of work that solves the wrong problem.

### 3\. Brief: decision point one

**What happens.** For unclear work an agent drafts two short documents: what the user will see and do, end to end, and how the change fits what already exists. A person reads both, corrects them and approves them before any work starts.

**Why it matters.** This is the point with the most leverage in the factory. Fixing a sentence in a brief takes a minute. Fixing the same decision in a finished change takes a day. The person reviews intent instead of output. When KyberBot hands the brief to agents, it carries what the task needs and nothing more; your memory stays with the assistant.

**What breaks without it.** Review turns into archaeology: reconstructing from the output what the agent meant, and finding that it meant something else.

### 4\. Execution: the least interesting stage

**What happens.** An execution agent, or a swarm, takes a ready ticket or an approved brief and prepares the change. In the Kyber design that is KyberAgent, each agent in its own KyberCell with the network closed by default.

**Why it matters.** Less than people think. If intake, triage and briefs work, execution is the most predictable part of the loop. Everyone wants to start here because it is where results show.

**What breaks if you start only here.** A fast agent writing changes for tickets nobody sorted or described. People spend their days rejecting work instead of approving it.

### 5\. Review: the stage that teaches itself

**What happens.** A reviewer agent checks every change against the approved brief before a person sees it, and can run its own suggestions in a sandbox before it makes them. A second agent collects the comments people leave in review and, from time to time, proposes a change to the reviewer’s instructions. That proposal is an ordinary change, approved by a person.

**Why it matters.** Team conventions do not have to be written in a document nobody reads. They build up in the reviewer’s instructions with every comment.

**What breaks without it.** People receive raw output and repeat the same five comments every week.

### 6\. Verification: decision point two

**What happens.** An agent runs the result the way a user would, end to end, and attaches evidence: screenshots, a short recording, a comparison with the approved brief.

**Why it matters.** Automated tests check what someone foresaw. A walk-through catches what nobody foresaw: a button hidden behind a notice, a form that works but cannot be filled in on a phone. The person’s job changes from investigating to confirming. Two minutes of evidence, then yes or no.

**What breaks without it.** The last step before release depends on whether someone had time to click through it by hand.

### 7\. Release: decision point three

**What happens.** A person accepts the change and releases it.

**Why it matters.** Release is where risk moves from the team to customers. Someone has to put their name to it. The agent prepares, checks and suggests; the person decides and answers for it. Every release in your name lands on the record with the rule and the answer that allowed it, the same way [every step an agent takes is on the record](https://kyberagent.com/blog/every-step-on-the-record).

### 8\. Monitoring: the loop closes

**What happens.** An agent watches the product in use, spots failures and odd behaviour, and opens a ticket that goes back to stage one.

**Why it matters.** Without it the factory is an assembly line. With it, the product reports what needs fixing, and a person may wake up to a ready fix with evidence attached, waiting only for a yes.

## What a good question looks like

Three decision points sound like little work until the questions arrive badly. A question from the factory should let you answer without opening anything else. In KyberBot’s design it carries six things:

1.  **What** will happen, in one sentence.
2.  **To whom or where:** the customer, the account, the production system.
3.  **What it costs**, in money or in what it uses up.
4.  **Whether it can be undone**, and how.
5.  **The evidence:** the brief it matches, the recording, the rule that sent it to you.
6.  **What happens if you say nothing:** nothing. Silence is never a yes.

## The second loop: a factory that improves the factory

Above the product loop runs a quieter one. An observer agent scores each run: what it cost, how many times a person had to step in, whether the change came back later as a bug. From that it proposes changes to the factory itself: a different model for triage, a sharper brief template, a new skill for the reviewer, a rule in your policy that would have spared you three identical questions.

To be safe, the factory’s definition has to be code: versioned, with bad changes undoable and new versions tested on part of the work against a fixed set of test tasks. A change to the factory goes the same way as a change to the product: proposal, review, a person’s acceptance. A factory that rewrites its own instructions without anyone’s consent will, within a quarter, be doing things nobody understands.

## The old cycle and the factory, side by side

Dimension

Old development cycle

Agent factory

Shape

a relay: linear handovers between people

a loop: monitoring feeds new work

Where the person looks

at the finished output

at the brief before the work and the evidence after it

Scarcest resource

developer time

a person’s attention at the decision points

Team knowledge

in heads and an outdated wiki

in agent instructions and policy, versioned with the work

Testing

tests written up front, plus manual clicking

tests plus a recorded walk-through checked against the brief

Improving the process

a retrospective once a sprint

every run scored, factory changes proposed for approval

Work in progress

private, on someone’s machine

visible to the team, in the factory’s queue

Who answers for the release

a person

still a person

The last row matters most. Requirements, architecture, approving the brief and the decision to release stay with people. Everything in between changes.

## Where a factory does harm

**Approval fatigue.** This one is easy to miss. A factory that asks about everything trains people to click yes without reading, and a yes given without reading is worse than no checkpoint, because it looks like control. If you approve more than a handful of things a day, the policy is too narrow or the questions are too poor. Fix those before adding agents.

**Automating tasks that only look simple.** “Bump the library version” sounds like a job for an agent, until the new version changes how rounding works in the invoicing module. Start where a mistake is cheap and shows at once.

**Skipping the brief because the agent is fast.** Fast work without an approved brief is the most expensive way to learn that everyone understood the task differently.

**Self-improvement without a brake.** A change to the factory without a person’s acceptance is drift, not progress.

**A factory without people.** A team told that the factory will replace it leaves before the factory works. People who like hard system problems usually take to building the factory fastest, if they get it as more responsibility rather than as a verdict.

## How to tell the factory works

Vanity metric

Outcome metric

amount of output produced by agents

how many times a person touched one change from request to release (should fall)

tokens used

cost of one closed change, and its trend month to month

number of agents running

share of requests that went through the loop with no correction after approval

approvals per day

share of approvals answered without opening anything else, and how many were later reversed

“agents do most of our work”

lead time for changes, deployment frequency, change failure rate and time to restore, the four DORA measures

A second model scoring quality can help, but only as a supplement. If corrections after release go up, no model score will hide that the factory is producing worse work.

## The order of building

Each step leaves you with a working system. You can stop after any of them and still have something useful.

1.  **Decision points and policy.** Before any agent, write down where you want to be asked and what may happen without you. That is the frame everything else plugs into.
2.  **Triage.** An agent sorts incoming work into the three bins and drafts fixes for small, clear problems. Requests start arriving sorted.
3.  **Briefs.** For unclear work, an agent drafts the brief and a person approves it before anything is done. Complex work enters the factory instead of stalling.
4.  **Review that learns.** A sandboxed reviewer checks every change against its brief; a second agent turns people’s comments into proposed instruction changes.
5.  **Verification with evidence.** An agent walks the user’s path, records it and compares it with the brief. The person confirms instead of investigating.
6.  **Connect and measure.** The coordinator joins the stages, monitoring feeds intake, the observer scores runs. Only now does the second loop start.

The same order works outside software, as described in the first part of this series, [Agent factories will reach every desk](https://kyberbot.com/blog/agent-factories-will-reach-every-desk). Where the factory’s policy, memory and approval record should live is the subject of the second, [Your agent factory learns how you decide](https://kyberbot.com/blog/who-keeps-what-your-agent-factory-learns).

On Monday, do one thing. Take the approvals you gave last week, in any system, and mark each one: could you answer it without opening anything else, yes or no? If most are no, the first thing your factory needs is not a faster agent. It is better questions.

That leaves a decision. You can give your team an agent that produces more, and watch the queue of things waiting for them grow. Or you can build the loop around the moments where a person’s judgement is actually needed, and let everything else come to them already prepared.

-   agent factory
-   SDLC
-   approvals
-   human in the loop
-   verification

## Keep reading

-   [An assistant that listens, not one that transcribes](https://kyberbot.com/blog/an-assistant-that-listens-not-transcribes)
-   [Your assistant is an auxiliary system too](https://kyberbot.com/blog/your-assistant-is-an-auxiliary-system-too)